CZ:Proposals/Approval and Feedback: Difference between revisions

From Citizendium
Jump to navigation Jump to search
imported>Gareth Leng
imported>Warren Schudy
Line 8: Line 8:
|Name and date of original proposer = [[User:Warren Schudy|Warren Schudy]] 13:34, 9 February 2008 (CST)
|Name and date of original proposer = [[User:Warren Schudy|Warren Schudy]] 13:34, 9 February 2008 (CST)
|Username of driver = [[User:Warren Schudy|Warren Schudy]]
|Username of driver = [[User:Warren Schudy|Warren Schudy]]
|Next step = Prepare specification for help-wanted ad on MediaWiki.
|Next step = Get permission from approval and feedback committee to find someone to implement the specification.
|Target date for next step = March 3
|Target date for next step = March 11
|Notes =  
|Notes =  
}}
}}

Revision as of 10:06, 6 March 2008

These are proposals that will go (or are now) before the Approval and Feedback group.

Enable external feedback

Summary: Each article should have a link for non-citizens to submit feedback. Feedback can be read and acted upon by any Citizen. Feedback can be read both in an additional tab for each cluster, as well as in a global queue similar to "recent changes".
Original proposer: Warren Schudy 13:34, 9 February 2008 (CST) Next step: Get permission from approval and feedback committee to find someone to implement the specification.
Driver: Warren Schudy To be done by: March 11
Complete proposal


Involving authors in approvals

Summary: There are two aspects: 1) I see no reason why anyone should not feel able to nominate an article for approval (even their own article). Indeed I see every reason why all contributors to Citizendium should feel encouraged to read articles with potential approval in mind.

2) To approve articles requires the support of relevant editors. But I see no reason why authors should not also be able (and indeed be encouraged) to express their support or otherwise for approval, and indeed as Citizendium values fluency and style then the opinions of non-expert readers are very important too.

Original proposer: Gareth Leng 07:57, 14 February 2008 (CST) Next step: Decision from Approvals and Feedback Group?
Driver: Gareth Leng 04:01, 15 February 2008 (CST) To be done by: March 10th?
Notes: Feedback so far seems positive (March 5th); awaits endorsement by Approvals group? Then implement?
Complete proposal


Proposals System Navigation (advanced users only)

Proposal lists (some planned pages are still blank):