USCG Island class: Difference between revisions
imported>Caesar Schinas m (Bot: Update image code) |
imported>Meg Taylor No edit summary |
||
(2 intermediate revisions by one other user not shown) | |||
Line 6: | Line 6: | ||
As originally built these vessels were crewed with sixteen personnel, were armed with a 25mm [[autocannon]], and were capable of speeds of approximately thirty knots. | As originally built these vessels were crewed with sixteen personnel, were armed with a 25mm [[autocannon]], and were capable of speeds of approximately thirty knots. | ||
Following [[al Qaeda]]'s attacks on September 11, 2001, a plan called "[[Project Deepwater]]" was to modernize and re-equip the Coast Guard's fleet. | Following [[al-Qaeda]]'s attacks on September 11, 2001, a plan called "[[Project Deepwater]]" was to modernize and re-equip the Coast Guard's fleet. | ||
The Island class cutters were to be lengthened from 110 to 123 feet. | The Island class cutters were to be lengthened from 110 to 123 feet. | ||
The crew accommodation were to be modernized to comply with a new policy for all cutters to accommodate crews of mixed sex. | The crew accommodation were to be modernized to comply with a new policy for all cutters to accommodate crews of mixed sex. | ||
The lengthening | The lengthening added a [[stern launching ramp]] designed so the vessels could launch and retrieve a water-jet propelled [[rigid-hull inflatable]] [[Short Range Prosecutor]] high speed pursuit boat, without coming to a halt first. | ||
Initially the first eight vessels to be modernized were described as a success. | Initially the first eight vessels to be modernized were described as a success. | ||
Line 23: | Line 23: | ||
| accessdate=2008-06-26 | | accessdate=2008-06-26 | ||
| quote= | | quote= | ||
}}</ref><ref name=Fcw20070418> | }} [http://www.webcitation.org/query?url=https%3A%2F%2Fwww.piersystem.com%2Fgo%2Fdoc%2F786%2F154307%2F&date=2011-05-23 mirror] | ||
</ref><ref name=Fcw20070418> | |||
{{cite news | {{cite news | ||
| url=http://www.fcw.com/online/news/102499-1.html | | url=http://www.fcw.com/online/news/102499-1.html | ||
Line 42: | Line 43: | ||
| accessdate=2008-06-01 | | accessdate=2008-06-01 | ||
| quote= | | quote= | ||
}}</ref> | }} [http://www.webcitation.org/query?url=http%3A%2F%2Fwww.washingtonpost.com%2Fwp-dyn%2Fcontent%2Farticle%2F2007%2F04%2F16%2FAR2007041601607.html&date=2011-05-23 mirror] | ||
</ref> | |||
The conversion had also gone several multiples over-budget. | The conversion had also gone several multiples over-budget. | ||
In 2007 the Coast Guard took over direct control of the Deepwater Program from the | In 2007 the Coast Guard took over direct control of the Deepwater Program from the | ||
Line 54: | Line 56: | ||
| accessdate=2008-06-26 | | accessdate=2008-06-26 | ||
| quote= | | quote= | ||
}} | }} [http://www.webcitation.org/query?url=http%3A%2F%2Fwww.defenseindustrydaily.com%2Fus-coast-guard-taking-over-lead-role-for-deepwater-program-03215%2F&date=2011-05-23 mirror] | ||
</ref> | </ref> | ||
Line 60: | Line 62: | ||
==References== | ==References== | ||
{{reflist}} |
Revision as of 22:32, 31 December 2013
The United States Coast Guard Island class of cutters included approximately five dozen vessels. As originally built these vessels were crewed with sixteen personnel, were armed with a 25mm autocannon, and were capable of speeds of approximately thirty knots.
Following al-Qaeda's attacks on September 11, 2001, a plan called "Project Deepwater" was to modernize and re-equip the Coast Guard's fleet. The Island class cutters were to be lengthened from 110 to 123 feet.
The crew accommodation were to be modernized to comply with a new policy for all cutters to accommodate crews of mixed sex.
The lengthening added a stern launching ramp designed so the vessels could launch and retrieve a water-jet propelled rigid-hull inflatable Short Range Prosecutor high speed pursuit boat, without coming to a halt first.
Initially the first eight vessels to be modernized were described as a success. But later it emerged that the lengthened stern were structurally unsound, and the converted vessels were unseaworthy.[1][2][3] The conversion had also gone several multiples over-budget. In 2007 the Coast Guard took over direct control of the Deepwater Program from the Prime Contractor. All current 123' cutters are now still in commission, but out of service.[4]
Forty-nine of the original Island class vessels remain in active service. The unmodified vessels still have to come to a halt to launch a boat.
References
- ↑ Thad Allen. STATEMENT BY ADM. THAD ALLEN on the converted 123-foot patrol boats and changes to the Deepwater acquisition program, United States Coast Guard, 2007-04-17. Retrieved on 2008-06-26. mirror
- ↑ Jason Miller. Justice Department investigating Deepwater for possible fraud, Federal Computer Week, 2007-04-18. Retrieved on 2008-06-26.
- ↑ Renae Merle, Spencer Hsu. Coast Guard To Take Over 'Deepwater': Move Wrests Control From Consortium of Contractors, Washington Post, 2007-04-17, p. D01. Retrieved on 2008-06-01. mirror
- ↑ US Coast Guard Taking Over Lead Role for Deepwater Program, Defense Industry Daily, 2007-04-18. Retrieved on 2008-06-26. mirror